Virya वीर्य·Energy intelligence for decisions that can’t be undone

Find the power.
Price the risk.
Know who signs off.

Every megawatt has a price, a policy and a gatekeeper. See all three.

Take the 60-second tour

Virya Radar

Virya Markets

One map, 16 layers: energy events, prices, queues, emissions, true cost, US transmission rates, interconnection costs, lead times, factories and solar yield worldwide.

Open the Map: Virya Markets

Virya Atlas · Where should we play?

Grid Readiness Score

86 economies graded on eight pillars, with official sources for each. Shortlist where the grid is ready for the AI decade.

Rank the Markets: Grid Readiness Score

Virya Radar · What is changing?

Policy Tracker

127 one-page briefs across 49 countries, each placed on its path from proposal to binding law.

Track Policies: Policy Tracker

Virya Underwriter · Will this project pencil?

Compute Underwriter

What does a GPU-hour really earn? Price an AI data center in 86 economies, 1 MW to 1 GW, and stress-test the downside.

Price a Site: Compute Underwriter

Virya Underwriter

Power Map

Fossil plants by emissions, connection queues, and the European grid, country by country.

Open the Power Map: Power Map

Virya Underwriter

Site Map

94,619 transmission lines, power plants, 2,931 utilities and 95 balancing authorities around a US site, with emissions and ERCOT prices.

Open the Map: Site Map

Virya Underwriter

Scenario Lab

Add a data center or cut a line in a five-bus power market, and see congestion set the price at every bus.

Run a Scenario: Scenario Lab

Virya Underwriter

Virya EPC

Interconnection studies, equipment lead times, and labor, for the people who build the grid.

Open Virya EPC: Virya EPC

Intro

Start here

Sample results

What a GPU-hour earns

Margin per GPU-hour for an H100 training site, from the Compute Underwriter on November 3, 2026. Fixed samples, not live prices.

  • Japan

    Japan: US dollars per GPU-hour
    SiteBase caseDownside
    1 MW$0.11Thin margin−$0.32Fails
    100 MW$0.25Earns−$0.17Fails
    1 GW$0.27Earns−$0.15Fails
  • India

    India: US dollars per GPU-hour
    SiteBase caseDownside
    1 MW−$0.06Small loss−$0.45Fails
    100 MW−$0.01Small loss−$0.40Fails
    1 GW$0.0038Thin margin−$0.39Fails
  • Brazil

    Brazil: US dollars per GPU-hour
    SiteBase caseDownside
    1 MW−$0.33Loses−$0.76Fails
    100 MW−$0.25Loses−$0.67Fails
    1 GW−$0.23Loses−$0.65Fails

Downside: GPU rent 20% lower and one year less GPU life, at the same time. Modeled scenarios and analysis, not investment advice.

Sign in to price any of 86 economies

60-second tour

One market, four steps: India

  1. Screen · Virya Atlas

    India: Grid Readiness grade and outage hours. Regulators and approvals mapped.

  2. Check · Virya Radar

    6 policies tracked, 7 procurement records, and 4 earnings notes.

  3. Grid and build · Power Map and Connection Rules

    613 fossil plants; 1,009 queued projects, 357.0 GW. Official grid connection rules.

  4. Price · Compute Underwriter

    Sample 100 MW H100 training site: −$0.01 per GPU-hour, −$0.40 in the downside.

Tools open after a free sign-in.

Use cases

Find your row

Power market intelligence for energy and compute investment. Each buyer starts from a different question; all of them work in the same three workspaces.

What each type of buyer does in each workspace
BuyerVirya AtlasVirya RadarVirya UnderwriterVirya Data
EnterpriseShortlist countries and regions for a campusTrack tenders, policies, and queue movesPrice and stress-test a 1 MW to 1 GW siteFeed site screens into internal GIS
ConsultantsClient-ready country diagnosticCurrent policies and RFPs for proposalsTeach clients LMPs and congestionPull data into client models
Financial institutionsCountry and regulatory risk for the memoEarnings and forecast-miss contextPower risk view for a loan or dealData for risk and valuation models

The platform

One platform, three workspaces

Each workspace answers one question a buyer asks about a power market. One account opens all of them: sign in once with your name, email, and country, and a 6-digit code keeps you signed in until you close your browser, or for 7 days if you choose.

See every tool on one page, with where its data reaches and whether it is live or a preview.

  • 86 economiesscored on 8 pillars, with official sources for each
  • 127 policy briefsacross 49 countries, each placed on its path to law
  • 16 map layersmarkets, grid, costs and equipment on one map

Virya Radar

What is changing? Monitor and act.

Pricing

Plans are coming soon

Every workspace is open today with a free sign-in. Paid plans start once billing is ready; nothing here can be bought yet. Each plan opens all three workspaces; what changes is the depth.

  • Free

    0 USD

    • Today: every workspace, with a free sign-in

    When paid plans start, Free keeps every workspace at preview depth: market summaries, ranks without pillar detail, Virya Underwriter at 1 MW, and no saved projects.

    Open today
  • Pro

    49 USD per user per month

    or 490 USD per year

    • Full market profiles
    • All of Virya Radar
    • Virya Underwriter at any size
    • Saved projects and Excel export
    Coming soon
  • Team

    39 USD per seat per month

    5-seat minimum

    • Pro, plus shared projects and watchlists
    • Weekly alerts by email
    • PDF and PowerPoint memo export
    Coming soon
  • Enterprise

    from 30k USD per year

    • Team, plus SSO and invoice billing
    • Virya Data API
    • Custom layers and white-label exports
    • Methodology support
    Coming soon

Contact

Talk to us

Questions, data requests, a first report, or a team plan: write to us.

contact@viryaintel.com